NB Power Transmission Model

Modèle développé
Types
Échelles spatiales
Échelles temporelles
Secteurs
Description

This model is mainly designed for New Brunswick but applicable to other jurisdictions and ca report results from 1-10 years.

Références

https://tso.nbpower.com/Public/en/docs-EN/NB%20Power%20Transmission%20Planning%20Criteria%20(EN).pdf

Applications

assess the ability for the grid to support integration of renewable energies

Utilisateurs

transmission infrastructure owners in New Brunswick (primarily NB power)

Intrants clés

system load, existing transmission and generation infrastructure and topology (obtained from similar models from other regions)

Extrants clés

internal electrical load capacity and interface capacity with other utilities