This model is mainly designed for New Brunswick but applicable to other jurisdictions and ca report results from 1-10 years.
NB Power Transmission Model
Modèle développé
Description
Références
https://tso.nbpower.com/Public/en/docs-EN/NB%20Power%20Transmission%20Planning%20Criteria%20(EN).pdf
Applications
assess the ability for the grid to support integration of renewable energies
Utilisateurs
transmission infrastructure owners in New Brunswick (primarily NB power)
Intrants clés
system load, existing transmission and generation infrastructure and topology (obtained from similar models from other regions)
Extrants clés
internal electrical load capacity and interface capacity with other utilities